← Latest news 
CleanMax to power Shell sites with 30 MW hybrid renewables in Gujarat and Karnataka
Business
Published on 24 April 2026

Shell gets electricity from CleanMax hybrid plants built locally
CleanMax plans to supply renewable electricity to Shell’s LNG terminal in Gujarat and technology centre in Karnataka. The Gujarat site will be powered by a 16.83 MW solar and wind hybrid project, while Karnataka’s 13.2 MW hybrid plant will feed Shell’s Bengaluru operations. The move aims to improve reliability and energy stability for Shell’s facilities.
- CleanMax will supply renewable power to two Shell locations
- Gujarat hybrid project capacity totals 16.83 MW
- Karnataka hybrid plant capacity is 13.2 MW for Bengaluru
- The plan is designed to strengthen Shell’s energy reliability
Read the full story at The Economic Times
This summarization was done by Beige for a story published on
The Economic Times
