Download the app
← Latest news

Mumbai to face 30 hour water shutdown from May 5 check areas and exact timings

India
Published on 30 April 2026
Mumbai to face 30 hour water shutdown from May 5 check areas and exact timings

A full 30 hours off for maintenance and tunnel link

Brihanmumbai Municipal Corporation (BMC) has scheduled a 30-hour water supply shutdown in parts of Mumbai from May 5, 10 am, to May 6, 4 pm, 2026. The break is for essential maintenance and water tunnel connection works under its Water Supply Project. Residents in several listed localities, including Pratiksha Nagar and Shastri Nagar, may see reduced supply during the window.

  • BMC plans a 30-hour water shutdown from May 5 to May 6, 2026
  • Downtime runs from 10 am to 4 pm to support tunnel connection and maintenance
  • Affected localities include Pratiksha Nagar and Shastri Nagar among others
  • Water supply may be reduced across multiple parts of the city during this period
Read the full story at Republic

This summarization was done by Beige for a story published on RepublicRepublic

The full experience is on mobile.

Swipe through stories, personalise your feed, and save articles for later — all on the app.